- September 27th, 2003: Painted the Garage
- December 1st, 2003: Started Building Workbenches
- December 4th, 2003: Finished First Workbench
- December 7th, 2003: Finished Second Workbench
- January 2nd, 2004: Finished compressed air supply
- January 8th, 2004: Cleaveland Toolkit Arrived
- April 22nd, 2004: Cleaned/Re-arranged Garage
- June 26th, 2004: Built C-Frame Thing; Waiting For Wings
- August 9th, 2004: Bought Band Saw; Cut Stock For AEX Tiedown Spacers
- January 29th, 2005: Gas Heater; Aileron Brackets; Riveted Left Aileron Gap Seal & Flap Brace
- March 1st, 2005: Cleaned Garage (yipee); Finished Right Wing Access Plates
- June 12th, 2006: Cleaned The Garage (exciting, huh?)
- January 13th, 2007: Steve Ashby's -8A; Cleaned Garge; Trim Wiring
- April 21st, 2007: THE BIG MOVE!
- April 22nd, 2007: Jaime's Car Back in Garage
- January 15th, 2004: Empennage Kit Arrived Today
- January 16th, 2004: Started Horizontal Stabilizer; Rear Spar Channels
- January 18th, 2004: More Horizontal Stabilizer Work
- January 31st, 2004: Completed Vertical Stabilizer
- February 12th, 2004: Riveted Left HS skin
- February 13th, 2004: Riveted Right HS skin
- February 14th, 2004: Finished Horizontal Stabilizer
- February 15th, 2004: Started Working On Rudder
- February 16th, 2004: Rudder Stiffeners
- February 21st, 2004: Prepared Rudder Parts for Priming
- February 22nd, 2004: Prepared Rudder Skins & Stiffeners
- February 23rd, 2004: Started Riveting Rudder Understructure
- February 24th, 2004: Primed/Riveted Rudder Understructure
- March 6th, 2004: Elevator Stiffeners; Epoxied Rudder Trailing Edge
- March 30th, 2004: Completed Right Elevator
- April 4th, 2004: Started Building Trim Tab
- April 9th, 2004: Temporarily Hung Tail Feathers
- July 7th, 2004: Took H-stab to Mike's For Help on Tips
- July 8th, 2004: Epoxied Alcad Strips to H-stab Tips
- July 12th, 2004: More work on H-stab tips
- May 15th, 2007: Empennage Tips
- May 16th, 2007: H-stab Tip Work
- May 17th, 2007: More Emp Tip Work
- May 20th, 2007: H-stab tip
- July 17th, 2007: Empennage Permanently Installed
- May 4th, 2004: Faxed Wing Kit Order To Van's
- May 11th, 2004: Bought Lumber For Wing Jig
- May 23rd, 2004: Built Wing Jig
- May 24th, 2004: Received Wing Order Confirmation
- July 29th, 2004: Picked Up Wing Kit From ABF
- July 31st, 2004: Inventoried Wing Kit; Started Spar Prep
- August 8th, 2004: Tank Platenuts; Started Fabricating Tiedown Spacers
- August 9th, 2004: Bought Band Saw; Cut Stock For AEX Tiedown Spacers
- August 10th, 2004: Polished AEX Tiedown Spacers
- August 15th, 2004: Spot-Primed Countersunk Holes
- August 17th, 2004: Finished AEX tiedowns; Started Rear Spars
- August 18th, 2004: Rear Spar Deburring Tasks
- August 19th, 2004: Finished Preparing Rear Spar for Priming
- August 21st, 2004: Primed (2x) Rear Spar; Started Prepping Ribs
- August 22nd, 2004: Wing Rib Prep (Part 1)
- August 24th, 2004: Wing Rib Prep (Part 2); Torqued AEX Tiedowns to Spar
- August 26th, 2004: Wing Rib Prep (Part 3)
- August 27th, 2004: Wing Rib Prep (Part 4); Clecoed/Drilled Main Ribs to Spars
- August 28th, 2004: Drilled Holes for Wiring Conduit
- August 29th, 2004: Primed Main Wing Ribs
- August 31st, 2004: Began Riveting Main Ribs to Spars
- September 1st, 2004: Finished Riveting Left Main Ribs to Main Spar
- September 6th, 2004: Finished Riveting Left Main Ribs to Rear Spar; Jigged Wing
- September 7th, 2004: Redrove Some Left Spar-to-Rib Rivets; Mulling Primer Job
- September 9th, 2004: Reprimed Right Main Wing Ribs; Clecoed Right Wing Skeleton
- September 11th, 2004: Riveted Right Wing Main Ribs; Jigged Right Wing
- September 13th, 2004: Removed Sag From Wings
- September 14th, 2004: Drilled Wing Walk Doublers, Started Fitting Skins
- September 16th, 2004: Finished Drilling Main Wing Skins to Skeleton
- September 17th, 2004: Started Left Wing Leading Edge
- September 21st, 2004: Started Right Wing Leading Edge
- September 28th, 2004: Drilled Replacement Rib; Drilled Some Holes
- October 1st, 2004: Z-Bracket Pathos
- October 2nd, 2004: Clecoed Right Tank Together; Fitted Right Tank to Wing
- October 3rd, 2004: Fabricated Tank Stiffeners
- October 4th, 2004: Started Clecoing Left Tank Together
- October 5th, 2004: Finished Clecoing Left Tank; Fitted Left Tank to Wing
- October 6th, 2004: Drilled Left Tank Z-brackets
- October 7th, 2004: More Left Tank Z-bracket Prep; Drilled Inboard Z-Brackets
- October 9th, 2004: Drilled Z-bracket Tops
- October 10th, 2004: Finished Drilling Tank; Fabricated Tank Attach Angles
- October 11th, 2004: Received Heated Pitot Tube
- October 15th, 2004: More Tank Prep
- October 16th, 2004: Lotsa Lotsa Tank Prep
- October 17th, 2004: Dimpling, Deburring Tank Parts
- October 19th, 2004: Never Ending Tank Prep
- October 20th, 2004: Received Pitot Mount; Modified Pitot for Mount
- October 22nd, 2004: Fuel Pickup Anti-Rotation Brackets; More Prep
- October 24th, 2004: Riveted Tank Stiffeners
- October 26th, 2004: Riveted Filler and Drain Flanges
- October 28th, 2004: Final Clecoing of Tanks Before Riveting
- November 7th, 2004: Honey-do's; Riveted First Tank Rib
- November 11th, 2004: Riveted Outboard Right Tank Rib
- November 13th, 2004: Finished Sealing Right Tank Ribs, Bracket, Etc.
- November 14th, 2004: More Right Tank Final Preparations
- November 16th, 2004: Started Riveting Left Tank
- November 18th, 2004: Riveted More Left Tank Ribs
- November 19th, 2004: Finished Left Tank Ribs
- November 20th, 2004: Started Deburring / Dimpling Right Leading Edge
- November 21st, 2004: Retapped Tiedown Rings
- November 26th, 2004: Flew To Cedartown; Installed Right Fuel Tank Baffle
- November 27th, 2004: Cleaned, Temporarily Installed Right Wing on Spar
- November 28th, 2004: Fabricated, Installed Left Tank Pickup
- November 30th, 2004: Installed Baffle, Z-brackets on Left Tank
- December 1st, 2004: BOTH FUEL TANKS FINISHED!!!
- December 5th, 2004: Finished Dimpling Left Leading Edge Parts
- December 7th, 2004: Joint Plate Nutplates; Faxed Fuselage Order
- December 10th, 2004: Countersunk Bottom Spar Flanges
- December 12th, 2004: Primed and Clecoed Leading Edges For Riveting
- December 16th, 2004: Riveted Left Leading Edge; Tank-To-LE Joint Problem
- December 17th, 2004: More Adjusting Tank To LE Joint
- December 18th, 2004: Dimpled Left Main Ribs, Spars; Installed Pitot Tube Mount
- December 19th, 2004: Riveted Left Leading Edge
- December 20th, 2004: Started Riveting Right LE To Spar
- December 23rd, 2004: Countersunk Left Spar For Skins
- December 28th, 2004: Prepped Top Skins For Priming
- December 29th, 2004: Rvited Right Inboard Top Skin
- December 30th, 2004: Riveted Right Outboard Skin; Riveted Left Leading Edge To Spar
- December 31st, 2004: Finished Right Top Skins; Left LE Rivets; Dimpled Left Ribs For Skins
- January 2nd, 2005: Riveted Left Inboard Top Skin
- January 3rd, 2005: Riveted Left Outboard Top Skin
- January 4th, 2005: Finished Squeezing Left Rear Spar To Top Skin Rivets
- January 6th, 2005: Fixed Leak In Left Tank
- January 8th, 2005: Installed Inboard-Most Z-bracket Nutplates On Spars
- January 18th, 2005: Wing Cradle; Pulled Wings From Jigs; Disassembled Wing Jigs
- January 20th, 2005: Ran Conduit In Left Wing; Started Fabrication of Aileron Brackets
- January 22nd, 2005: Prepped Aileron Brackets and Gap Seals, Flap Braces; Ran Pitot Tubing
- January 23rd, 2005: Broke 3/32 Dimple Die...Again!!!!
- January 29th, 2005: Gas Heater; Aileron Brackets; Riveted Left Aileron Gap Seal & Flap Brace
- January 30th, 2005: Right Flap Brace; More Deburring/Dimpling Bottom Wing Skins
- February 1st, 2005: Finished Riveted Aileron Brackets, Right Flap Brace
- February 3rd, 2005: Scuffed Bottom Skins For Priming; Final Prep Before Closing Wings
- February 4th, 2005: MEK'd Wing Skins For Priming
- February 5th, 2005: Riveted Bottom Inboard Skin To Right Wing
- February 10th, 2005: Trimmed, Deburred, Dimpled Aileron Stiffeners
- February 12th, 2005: Started Riveting Right Bottom Outboard Skin; Riveted Aileron Stiffeners
- February 13th, 2005: Finished Riveting Bottom Skins on Right Wing
- February 16th, 2005: Clecoed Together Ailerons; Start Match-Drilling Ailerons
- February 17th, 2005: Riveted Left Inboard Bottom Skin
- February 18th, 2005: Match-drilled Ailerons
- February 19th, 2005: Deburred, Dimpled Left Aileron Components
- February 21st, 2005: Dimpled Right Aileron Leading Edge Skin
- February 22nd, 2005: Dimpled Left Leading Edge Aileron Skin (Properly)
- February 23rd, 2005: Finished Prepping Aileron Parts for Priming
- February 24th, 2005: Almost Finished Riveting Bottom Skins To Left Wing
- February 25th, 2005: Finished Skinning Wings!!!!
- February 26th, 2005: Flew w/ Jaime and Amanda; Finished Right Aileron
- February 27th, 2005: Finished Left Aileron
- March 1st, 2005: Cleaned Garage (yipee); Finished Right Wing Access Plates
- March 3rd, 2005: Drilled Left Flap
- March 4th, 2005: Drilled Right Flap
- March 5th, 2005: Fabricated FL-706A's; Dimpling, Deburring Flap Parts
- March 12th, 2005: Finished Fuselage Inventory; Finished Flap Prep
- March 13th, 2005: Primed Flap Components; Finished Left Flap
- March 16th, 2005: Finished Right Flap
- March 18th, 2005: Pitot System
- March 21st, 2005: Cut Bellcrank-To-Aileron Pushrods
- March 25th, 2005: Fabricated Aileron Pushrods
- March 26th, 2005: Installed Right Aileron Bellcrank
- March 27th, 2005: Mounted Right Aileron On Wing
- March 28th, 2005: Right Wing Pushrods; Drilled Right Flap Hinge
- March 29th, 2005: Removed Right Flap Brace (arrgh!)
- March 30th, 2005: Finished Attaching Right Flap
- April 1st, 2005: Installed Left Flap Brace and Left Flap
- April 2nd, 2005: Installed Left Aileron Bellcrank; Started Fuselage Construction!
- April 4th, 2005: Misc. Wing Pop-Rivets; Countersinking Firewall Parts
- January 30th, 2007: Left Wingtip Lens
- January 31st, 2007: Left Wingtip Lens Done; Rear Window Final Installed; Hangar
- February 7th, 2007: Strobe/Pos Lights In Wingtips
- February 10th, 2007: Project Visit; Wintip Work
- February 11th, 2007: More Wingtip Work
- February 13th, 2007: Bafflling, Remounting Wingtips
- February 14th, 2007: More Wingtip Reinforcing; Baffles
- April 23rd, 2007: Misc. Wing Stuff
- April 24th, 2007: Left Wing Pickup SB; Misc
- April 26th, 2007: Wing Root Wiring Connectors
- April 27th, 2007: Wings Final Installed!
- April 28th, 2007: Wing Bolt Nuts are Nuts
- April 29th, 2007: Flap Rigging
- May 2nd, 2007: Wing Bolt Nuts are Installed
- June 3rd, 2007: Re-drilled Wingtips
- June 25th, 2007: Ready For Engine Run
- July 10th, 2007: Wingtip Work
- March 9th, 2005: Fuselage Kit Arrived!!
- March 10th, 2005: Unpacking/Inventorying Fuselage Kit
- March 12th, 2005: Finished Fuselage Inventory; Finished Flap Prep
- April 2nd, 2005: Installed Left Aileron Bellcrank; Started Fuselage Construction!
- April 3rd, 2005: Fabricated/Drilled Firewall Parts; Started Dimpling Firewall
- April 4th, 2005: Misc. Wing Pop-Rivets; Countersinking Firewall Parts
- April 6th, 2005: Deburred/Dimpled Firewall Components
- April 12th, 2005: Finished Prepping Firewall Components for Priming
- April 17th, 2005: Returned from SnF; Primed/Started Riveting Firewall
- April 18th, 2005: Finished Firewall (excluding recess)
- April 19th, 2005: Started Center Section Buildup
- April 20th, 2005: Center Section Drilling; Control Assembly Bracket
- April 23rd, 2005: Still Cranking on Center Section Bulkhead
- April 24th, 2005: Finished Center Bulkhead Work
- April 26th, 2005: Started F-705 Bulkhead Construction
- April 27th, 2005: More F-705 Work
- April 28th, 2005: More F-705 Fabricatation and Drilling
- April 29th, 2005: Still Working on F-705
- April 30th, 2005: Continued Working on Bulkheads
- May 1st, 2005: LZU to JZP; Finished Drilling Bulkheads
- May 2nd, 2005: Started Prepping Bulkheads for Priming
- May 3rd, 2005: More Prepping Bulkhead Parts
- May 6th, 2005: Started Priming/Riveting Bulkheads
- May 7th, 2005: Finished Riveting Bulkheads
- May 8th, 2005: Started Bending Longerons
- May 11th, 2005: More Bending of Longerons
- May 12th, 2005: Bought/Mounted New Bench Vice (whooptydoo!)
- May 14th, 2005: Built Two Sawhorses; Clecoed/Started Drilling Aft Fuselage
- May 15th, 2005: Drilled/Disassembled/Started Deburring Aft Fuselage
- May 17th, 2005: Continued Deburring/Dimpling Aft Fuse Parts
- May 21st, 2005: Still prepping aft fuse parts!
- May 22nd, 2005: Finished Prepping/Priming, Started Riveting Aft Fuse
- May 23rd, 2005: Clecoed Aft Fuse For Final Assembly
- May 24th, 2005: Started Riveting Aft Fuse
- May 25th, 2005: More Aft Fuse Riveting
- May 26th, 2005: Major Progress Riveting the Aft Fuse
- May 27th, 2005: Finished (for now) Riveting Aft Fuselage
- May 28th, 2005: Clecoed, Started Drilling Seat Rib Area
- May 30th, 2005: Finished Drilling/Started Deburring Center Fuselage
- June 1st, 2005: Finished Deburring/Dimpling Bottom Center Skin
- June 2nd, 2005: More Deburring of Center Fuse Parts
- June 3rd, 2005: More Deburring/Countersinking/etc Center Fuse Parts
- June 4th, 2005: Removeable Baggage Floors/Seat Pans; Ready For Primer
- June 5th, 2005: Started Riveting Center Fuselage
- June 8th, 2005: More Riveting on Center Fuselage
- June 12th, 2005: Ready to Rivet Center Bottom Skin
- June 13th, 2005: More Lapbelt Anchor Stuff
- June 14th, 2005: Started Riveting Center Bottom Skin
- June 15th, 2005: Finished Riveting Center Bottom Skin
- June 18th, 2005: New Toy For Garage; Center Fuse Ready For Aft Fuse
- June 19th, 2005: More Longeron Bending
- June 28th, 2005: Finished Bending Longerons; Drilled Aft Canopy Decks
- June 29th, 2005: Joined Aft and Center Fuse; Fitting Longerons
- June 30th, 2005: Finished Fitting Longerons; Misc. Work
- July 1st, 2005: Drilled Arm Rests; Mulling Side Skin Roll
- July 2nd, 2005: Rolled Forward Skins; Step Holes; Drilled Longerons
- July 3rd, 2005: Drilled Firewall To Fuse
- July 6th, 2005: Cut Gear Leg Socket Holes in F-722
- July 9th, 2005: Aux Longerons; Stiffeners; Drilling
- July 10th, 2005: Drilled Left Center Bottom to Corner Rib
- July 12th, 2005: More Drilling; Forward Side Stiffener Brackets
- July 13th, 2005: Fabricated/Started Fitting Lower Longerons
- July 14th, 2005: More Forward Fuse Angle Obsession
- July 16th, 2005: Started Drilling Lower Longerons To Fuse
- July 19th, 2005: Trimmed/Drilled Left F-684 Gusset
- July 20th, 2005: Made/Drilled New Left F-684 Gusset
- July 21st, 2005: Fitted Forward Bulkheads; Right Reinforcement Web
- July 22nd, 2005: Drilled Left Reinforcement Web
- July 23rd, 2005: Drilled Left Tank Attach Angle
- July 24th, 2005: Constructed Brake Pedals
- July 25th, 2005: Finished Rudder Pedals; Started Drilling Floor Stiffeners
- July 26th, 2005: Framed Baggage Area; Finished (almost) Drilling Fuselage
- July 27th, 2005: Started Disassembly of Fuselage
- July 28th, 2005: More Fuselage Deburring, Dimpling/Countersinking
- July 29th, 2005: More Dimpling/Deburring on the Fuselage
- July 30th, 2005: STILL Deburring/Dimpling
- July 31st, 2005: Deburred/Dimpled F-722, Left Foward Side Skin
- August 1st, 2005: Finished Dimpling Side Skins, Firewall
- August 2nd, 2005: Longerons, Doubler Plates Ready to Prime
- August 3rd, 2005: Mulling Interior Priming/Painting Cabin Parts
- August 4th, 2005: Primed/Started Final Assembly of Forward Fuse
- August 5th, 2005: Started Riveting Forward Side Skins
- August 6th, 2005: More Riveting On Forward Fuse
- August 7th, 2005: Riveting Marathon
- August 8th, 2005: Riveted Tank Attach Reinforcement Angle
- August 9th, 2005: More Fuse Riveting
- August 10th, 2005: Almost Finished Riveting Forward Fuse
- August 11th, 2005: Flipped The Fuselage!
- August 13th, 2005: Tweaked Right Longeron
- August 14th, 2005: Aft Fuse Done (Below Longerons); Seat Nutplates, Etc.
- August 15th, 2005: Drilled Aft Deck
- August 17th, 2005: Misc Screws/Bolts/Rivets
- August 18th, 2005: More Seat Rib Nutplates
- August 19th, 2005: Drilled Seat Back Gussets
- August 21st, 2005: More Drilling Of Random Parts
- August 22nd, 2005: Still Playing With Aft Canopy Deck
- August 23rd, 2005: Prepped/Primed/Riveted Aft Fuselage Deck
- August 28th, 2005: Riveted Aft Deck, Canopy Decks, Gussets
- August 29th, 2005: New Toy; Stupid Builder Error
- August 30th, 2005: Fixed Stupid Builder Error
- August 31st, 2005: Riveted Bulkhead-to-Fuselage Rivets; Clecoed Aft Top Skin
- September 1st, 2005: More Drilling/Fitting Top Skins
- September 2nd, 2005: Finished Drilling Aft Top Skins; Started Step Install
- September 3rd, 2005: Drilled Steps To Fuselage
- September 5th, 2005: Riveted Both Steps
- September 6th, 2005: Riveted Left Baggage Side Wall
- September 7th, 2005: Finished Baggage Side Walls
- September 8th, 2005: Started Aft Baggage Wall
- September 12th, 2005: Mulling ELT Install; Fixed Some Rivets
- September 13th, 2005: More Baggage Wall Stuff
- September 14th, 2005: Still Working On Baggage Wall
- September 15th, 2005: Almost Finished With Baggage Wall
- September 16th, 2005: Done w/ Aft Baggage Wall
- September 17th, 2005: More Cabin Platenut Stuff
- September 18th, 2005: Made Forward Tunnel Cover; Started Seat Backs
- September 20th, 2005: More Seat Back Work
- September 21st, 2005: Finished Drilling Right Seat Back
- September 22nd, 2005: Finished Drilling Seat Backs
- September 23rd, 2005: Started Deburring Seat Back Components
- September 26th, 2005: Started Riveting Seat Backs
- September 27th, 2005: Finished Seat Backs; Started Seat Back Braces
- September 28th, 2005: Finished Seat Back Braces; Started Center Channel Cover
- September 29th, 2005: Heat Baffle; Fuel Selector Plate
- September 30th, 2005: Started Flap Motor Assembly
- October 1st, 2005: Completed Flap Motor Install
- October 2nd, 2005: Fit/Temporarily Installed Right Gear Weldment
- October 3rd, 2005: Still Trying To Fit Left Gear Leg Weldment
- October 5th, 2005: Gear Leg Weldments Suck
- October 7th, 2005: Plan to Fix Weldment Issue
- October 9th, 2005: Left Gear Weldment if FINALLY IN!
- October 10th, 2005: Satisfied With Left Weldment
- October 12th, 2005: Need To Reorder Left Gear Leg Mount
- October 13th, 2005: Torqued Step Bolts; Mulling ELT Mount
- October 16th, 2005: Went Flying; Still Playing w/ ELT
- October 17th, 2005: Received New Gear Leg Weldment, Other Items
- October 18th, 2005: Still Fighting Weldments
- October 19th, 2005: WELDMENTS SUCK!
- October 20th, 2005: Hmm....guess what? Weldments.
- October 21st, 2005: Misc. Nutplates
- October 23rd, 2005: Finished Seat Rib Nutplates; Started Seat Pan Hinges
- October 24th, 2005: Drilled Right Seat Pan Hinges
- October 25th, 2005: Riveted Hinges To Seat Pans
- October 26th, 2005: Started Fitting New Left Weldment
- October 27th, 2005: FINALLY DRILLED THE GEAR LEG WELDMENTS!!!
- October 28th, 2005: Prepping For Wing Fitting
- October 29th, 2005: Preparing To Mate Wings
- October 30th, 2005: Mated The Wings; Problem With Wing Sweep
- October 31st, 2005: More Playing Around With Wing Incidence
- November 1st, 2005: Started Checking Incidence
- November 2nd, 2005: Set Incidence With Smart Tool
- November 4th, 2005: Wing Sweep Down To 0.15
- November 5th, 2005: Drilled Rear Spar Bolts
- November 10th, 2005: Hung Flaps
- November 12th, 2005: Flew to Rome; Right Flap Is Rigged
- November 13th, 2005: Mounted Left Flap, Sticks; Rigging Ailerons
- November 15th, 2005: Studying Cabin Plumbing
- November 19th, 2005: Plumbed Vent Lines
- November 25th, 2005: Removed Wings; Installing Nuteplates
- November 26th, 2005: Wing Root Nutplates; Started Cabin Frame
- November 27th, 2005: Continued Cabin Frame Work
- November 29th, 2005: Drilled Cabin Frame Lower Strip
- December 3rd, 2005: More Canopy Frame Fun
- December 4th, 2005: Finished Drilling Cabin Frame Channels
- December 6th, 2005: Countersinking/Deburring Cabin Frame
- December 7th, 2005: Riveted Roll Bar
- December 8th, 2005: Fitting Canopy Frame to Fuselage
- December 10th, 2005: Drilled Cabin Frame Brackets to Fuse
- December 11th, 2005: Started Subpanel Assembly
- December 13th, 2005: F abricating Forward Fuse Parts
- December 15th, 2005: Fabricated, Started Drilling Panel Reinforcement
- December 17th, 2005: Finished Drilling Panel Reinforcement; Subpanel Stuff
- December 18th, 2005: More Subpanel Prep
- December 19th, 2005: Cleaned Garage; Ordered Seats
- December 20th, 2005: Goofing Off w/ the Instrument Panel
- December 21st, 2005: Geez...Very Slow Progress
- December 22nd, 2005: Finished Fitting Panel
- December 23rd, 2005: Dimpled Aft Top Skins; Static System
- December 26th, 2005: Dimpling Deburring; Drilled Shoulder Harness Anchors
- December 27th, 2005: Fabricated, Drilled Rudder Cable Exit Fairings
- December 28th, 2005: More Cabin Frame Work
- December 29th, 2005: Finished Cabin Frame; 'Fixed' Seat Interference Issue
- December 30th, 2005: More Aileron Trim Work; Riveted Side Channels
- January 2nd, 2006: Ran Conduit to Aft Fuse; Static System Clips
- January 3rd, 2006: Riveted Rudder Exit Fairings; Ready to Prime
- January 4th, 2006: Primed Aft Top Skins; Misc. Stuff
- January 7th, 2006: Installed Crotch-Strap Anchors
- January 8th, 2006: Riveted Aft-most Top Skin
- January 9th, 2006: Started Painting Interior Components
- January 11th, 2006: Stripped Upper Bulkhead Paint; More Part Prep
- January 14th, 2006: More Prep for Interior Paint
- January 15th, 2006: Flew w/ Josh; Painting Disaster (possibly overstated)
- January 16th, 2006: Finished Painting Interior
- January 17th, 2006: Installed Rollbar; Started Installing Gear Weldments
- January 18th, 2006: Finished Installing Gear Weldments
- January 19th, 2006: Reconstructed Brake Pedals
- January 21st, 2006: Installed Rudder Pedals, Brakes, Fuel Selector, Fuel Pump
- January 22nd, 2006: Brake Plumbing
- January 24th, 2006: More Brake Work; Installed Flap Motor
- January 26th, 2006: Dimples, Prepped/Primed Subpanel Components
- January 27th, 2006: Dimpled Firewall
- January 28th, 2006: Riveted Subpel and Ribs; Canopy Latch Drill Guide
- February 2nd, 2006: Canopy Latch Pushrod; Completed Brake System
- June 3rd, 2006: Panel Paint Musings; Heat Selector; Fitting Engine Mount
- June 5th, 2006: Installed Vent Lines; Mulling Headset Jack Locations
- June 21st, 2006: Started Making AFP Pump Cover
- August 4th, 2006: Com Antenna Lead; Mounting H-Stab
- August 5th, 2006: Disecant Plugs; Started Drilling H-stab to Fuse
- August 6th, 2006: Mounted h-stab; Started Fitting V-stab
- August 10th, 2006: Started Mounting VS
- August 12th, 2006: More V-stab Mounting
- August 14th, 2006: Finished Mounting Empennage
- August 15th, 2006: Fitting Empennage Fairing
- January 23rd, 2007: Installed Elevator Bellcrank; More Electrical Fuel Pump Stuff
- January 27th, 2007: Riveted Final Top Skin
- March 24th, 2007: Pro-sealed NACA inlets, Wing Roots; GPS RS-232 stuff
- April 10th, 2007: Experimental Placard
- April 19th, 2007: Started Riveting Forward Front Skin
- April 20th, 2007: Last Skin Riveted!!!!
- June 8th, 2007: Took Emp to Airport; Installing Emp Components
- July 15th, 2007: Misc, Drilled Elevator Horns
- August 16th, 2005: Finish Kit Arrived; Inventoried Finish Kit
- January 28th, 2006: Riveted Subpel and Ribs; Canopy Latch Drill Guide
- January 29th, 2006: Drill Fuselage Side Skin for Latch Handle
- January 31st, 2006: Riveted Primary Canopy Latch
- February 1st, 2006: More Primary Canopy Latch Work
- February 2nd, 2006: Canopy Latch Pushrod; Completed Brake System
- February 4th, 2006: Fitting Canopy Frame To Fuselage
- February 5th, 2006: More Fitting Of Canopy Frame
- February 7th, 2006: Still Messin' w/ Canopy Frame
- February 8th, 2006: Canopy Frame Continued
- February 11th, 2006: Screwed Up Canopy Frame Weldment
- February 16th, 2006: More Canopy Frame Construction
- February 17th, 2006: Started Fitting New Canopy Weldment
- February 20th, 2006: Still Fitting/Adjusting Canopy Frame
- February 21st, 2006: Ready to Drill Canopy Frame (Again)
- February 22nd, 2006: Finally Drilled Canopy Frame Hinges
- February 26th, 2006: More Canopy Frame Fitting
- February 28th, 2006: Drilling Various Canopy Frame Parts
- March 1st, 2006: Riveted Canopy Frame (Minus Skin)
- March 2nd, 2006: Started Canopy Plexiglass
- March 4th, 2006: Started Cutting Canopy
- March 5th, 2006: Finished Trimming Front of Canopy
- March 9th, 2006: Puckered Up and Made the Big Cut
- March 11th, 2006: Canopy, Shanopy
- March 15th, 2006: Canopy Asymmetry
- March 16th, 2006: Canopy Fit Good; Started Drilling Pilot Holes
- March 21st, 2006: More Canpy Pilot Hole Drilling
- March 22nd, 2006: Drilled The Plexi
- March 23rd, 2006: Trimming Rear Window
- March 25th, 2006: Located Rear Window Screw Locations
- March 26th, 2006: Trimmed, Drilled Rear Window; CANOPY TRIMMING DONE!
- March 28th, 2006: Countersinking the Plexi
- March 29th, 2006: More Canopy Countersinking
- March 30th, 2006: CRACKED THE CANOPY (small one)
- March 31st, 2006: Made, Drilled Canpy Side Skirts
- April 1st, 2006: Finished Drilling Canopy Side Skirts
- April 3rd, 2006: Drilled Reinforcement Kit To Canopy Frame
- April 10th, 2006: Test Fitting Seats
- April 12th, 2006: Laid out Instrument Holes; Made Some Decisions
- April 14th, 2006: Canopy Frame Skin Riveting; Received Radio Stack
- April 18th, 2006: Riveted Canopy Frame Skin
- April 19th, 2006: Riveted Stiffener Angles; Fixing Front Skin Clearance Issues
- April 23rd, 2006: Painted Canopy Frame
- April 25th, 2006: Started Screwing Plexi to Frame
- April 29th, 2006: Starting Laying Up Canopy Fairing
- April 30th, 2006: More Layups on the Canopy Fairing
- May 4th, 2006: More Sanding/Filling on the Canopy Fairing
- May 5th, 2006: Canopy Fairing Filling; Drilled Holes For DRE-244E
- May 6th, 2006: More Panel Cutting; Canopy Fairing; DA-20 Checkout
- May 7th, 2006: Canopy Fairing; Radio Cutout Done; More Panel Cuts
- May 8th, 2006: More Canopy Fairing Work
- May 10th, 2006: (Incorrect) Firewall Forward Kit Arrived; More Canopy Fairing
- May 11th, 2006: Received Prop; Canopy Fairing; Trim Indicator Rant
- June 4th, 2006: Helped Scott w/ His Wings; Installed Engine Mount
- June 13th, 2006: Wheels and Tires, etc.
- June 14th, 2006: Left Wheel Assembled; Altitude Encoder
- June 15th, 2006: All Wheels on Gear
- June 16th, 2006: Engine Arrived; Put Plane on Gear
- August 17th, 2006: Adjusted Control Sticks
- January 28th, 2007: Started Installing Rear Window
- January 31st, 2007: Left Wingtip Lens Done; Rear Window Final Installed; Hangar
- April 13th, 2007: Canopy Struts
- April 14th, 2007: Canopy Lift Struts Installed
- April 15th, 2007: Canopy Latch Lugs
- April 17th, 2007: Sanded out canopy fairing
- July 3rd, 2007: Brakes
- July 4th, 2007: Brakes Done
- July 11th, 2007: More Wingtip Stuff; N-numbers; Pitot-Static System
- July 14th, 2007: Emp Fairing
- March 24th, 2006: Bench Tested GX50
- April 14th, 2006: Canopy Frame Skin Riveting; Received Radio Stack
- April 17th, 2006: Cut Instrument Panel
- May 5th, 2006: Canopy Fairing Filling; Drilled Holes For DRE-244E
- May 7th, 2006: Canopy Fairing; Radio Cutout Done; More Panel Cuts
- May 11th, 2006: Received Prop; Canopy Fairing; Trim Indicator Rant
- May 17th, 2006: I have an electrical system!
- May 18th, 2006: Drilled Firewall for Master and Starter Contactors
- May 20th, 2006: Permanantly Installed Master/Starter contactors
- May 21st, 2006: Drilled the avionics tray supports
- May 22nd, 2006: Made Avionics Subpanel Penetration
- May 25th, 2006: Received B&C Order
- May 28th, 2006: Drilled Switch Holes; Installed Fuse Blocks
- May 29th, 2006: Panel Cutting Mostly Done
- May 30th, 2006: Key Switch Anti-rotation; Began Installing Vents
- May 31st, 2006: Finished Making Vent Mounts
- June 1st, 2006: Switch Anti-rotation
- June 2nd, 2006: Riveted Random Stuff To Panel
- June 3rd, 2006: Panel Paint Musings; Heat Selector; Fitting Engine Mount
- June 6th, 2006: Started Avionics Wiring
- June 7th, 2006: Wired GX50 to SL40
- June 8th, 2006: Sent Final Engine Payment; Painted Panel
- June 10th, 2006: Second Coat on Panel; Putting Stuff In
- June 11th, 2006: Misc. Wiring
- June 13th, 2006: Wheels and Tires, etc.
- June 14th, 2006: Left Wheel Assembled; Altitude Encoder
- June 18th, 2006: Engine Bolt Washers; Wiring
- June 20th, 2006: ANL Limiter; Wiring
- June 25th, 2006: Mounted Strobe Power Supply, COM Antenna
- June 26th, 2006: Wired Pax Headset Jacks
- June 29th, 2006: SL-40 Still Kicking
- June 30th, 2006: Installed Pilot's Headset Jacks
- July 3rd, 2006: Misc Wiring Runs
- July 6th, 2006: Battery Musings
- July 9th, 2006: More Misc. Wiring
- August 4th, 2006: Com Antenna Lead; Mounting H-Stab
- August 19th, 2006: Wiring Stick Grips
- August 20th, 2006: Finished Soldering Stick Grips
- August 21st, 2006: Received, Started Installing Dynon Units
- August 31st, 2006: Pulling Wires
- September 2nd, 2006: Dynon EMS+EFIS Wiring; Mixture Control; MP
- September 13th, 2006: Dynon EMS Alert Audio Wiring
- September 16th, 2006: Wired Flap Motor
- September 17th, 2006: Map Light; Dimmers
- September 19th, 2006: Pitot Connector
- September 20th, 2006: Position Light Wiring
- September 21st, 2006: Map Light Wiring; Passive Audio Mixer
- September 23rd, 2006: Pulled Instrument Panel for Repaint
- September 25th, 2006: Wet-sanded Instrument Panel
- September 26th, 2006: Repainted the Panel
- September 27th, 2006: Started Re-installing Panel Stuff
- October 3rd, 2006: Trim System Wiring
- October 11th, 2006: Instrument Panel Lighting Complete (almost)
- October 22nd, 2006: Almost Done With Spinner
- October 23rd, 2006: Tidying up Electrical
- October 24th, 2006: Wired Transponder
- October 29th, 2006: Trim Wiring
- October 31st, 2006: Dynon Firmware Update
- November 1st, 2006: More Stick Grip Wiring
- November 2nd, 2006: Stick Wiring Continued
- November 5th, 2006: Yep...more Trim Wiring
- November 8th, 2006: Finished Wiring Passenger Stick
- November 10th, 2006: Started Making ELT Mounting Bracket
- November 11th, 2006: Finished installing ELT
- December 11th, 2006: Dynon EMS is Tango Uniform
- December 29th, 2006: Dynon EMS re-installed; FAB swiss cheese; GPS antenna
- December 31st, 2006: Installed/Wired GPS Antenna
- January 2nd, 2007: Dynon Keels over Again
- January 3rd, 2007: Sent Dynon For Repair (again); More Wiring
- January 4th, 2007: Started Strobe Wiring
- January 6th, 2007: Rudder Wires Fuse Exit
- January 9th, 2007: Tied off fuselage wires; Rewired position lights
- January 10th, 2007: More FAB Work; Static System
- January 11th, 2007: More Airbox Work ; Trim Relays
- January 13th, 2007: Steve Ashby's -8A; Cleaned Garge; Trim Wiring
- January 14th, 2007: Playing With Panel Labeling; More Electrical Stuff
- January 15th, 2007: Installed new EMS; Aileron Trim Servo
- January 16th, 2007: Final Installed Aileron Servo; Installed ELT Antenna
- January 18th, 2007: More Wire Tidying; More Strobe Wiring
- January 20th, 2007: Prop Governor Arm Rotation (Part 1); OAT Probe; Pell City Lunch
- January 21st, 2007: OAT Probe Installed; Governor Final Installed
- January 25th, 2007: Strobe Power Supply Wiring Finished; Misc Stuff
- March 15th, 2007: Bottom Ignition Wires; OAT, Fuel Level Wires
- March 17th, 2007: More Main Bus Circuits; Trio Install
- March 18th, 2007: Trio;/GX-50 Debugging
- March 23rd, 2007: Trio Servo Install; 'Fixed' Trio GPS Feed
- March 24th, 2007: Pro-sealed NACA inlets, Wing Roots; GPS RS-232 stuff
- March 27th, 2007: Misc. Stuff; Final Installed Radio Trays
- March 28th, 2007: Installed Transponder d-sub
- March 29th, 2007: Misc. Wiring
- April 2nd, 2007: Bundling Wires; Labeling Panel
- April 3rd, 2007: AFP Fuel Pump Stuff
- April 4th, 2007: Flow Transducer, AFP Install Done
- April 12th, 2007: Alternator Failure Light; Vent Tubing Installed
- April 18th, 2007: Recieved my headsets
- May 22nd, 2007: Wing Root Wiring Done
- May 10th, 2006: (Incorrect) Firewall Forward Kit Arrived; More Canopy Fairing
- May 11th, 2006: Received Prop; Canopy Fairing; Trim Indicator Rant
- June 3rd, 2006: Panel Paint Musings; Heat Selector; Fitting Engine Mount
- June 8th, 2006: Sent Final Engine Payment; Painted Panel
- June 16th, 2006: Engine Arrived; Put Plane on Gear
- June 17th, 2006: Hung The Engine!
- June 18th, 2006: Engine Bolt Washers; Wiring
- June 19th, 2006: Cabin Heat
- July 10th, 2006: AFP Pump Installation
- July 12th, 2006: Fuel Pump
- July 15th, 2006: Installed Alternator; Began Hanging Exhaust
- July 29th, 2006: Finished Hanging Exhaust; Prop Governor
- August 5th, 2006: Disecant Plugs; Started Drilling H-stab to Fuse
- August 22nd, 2006: More Dynon EMS wiring
- August 23rd, 2006: FWF Hoses; More Probe Installation
- August 24th, 2006: EMS Wire Routing; Final Torqued Engine Mount Bolts
- August 26th, 2006: Went Flying; Control Cable Routing
- August 27th, 2006: Made, Installed Engine Control Bracket
- August 29th, 2006: More Engine Control Stuff
- September 2nd, 2006: Dynon EMS+EFIS Wiring; Mixture Control; MP
- September 3rd, 2006: EGT, CHT probes
- September 4th, 2006: Finished Running CHT and EGT probes
- October 12th, 2006: Temporarily Mounted The Prop
- October 14th, 2006: More Spinner Work
- October 15th, 2006: Spinner Dome Cutting; Marked Screw Locations
- October 22nd, 2006: Almost Done With Spinner
- November 12th, 2006: Started Fitting Cowl
- November 13th, 2006: Removed Bleeder Material from Cowl
- November 15th, 2006: Cowl Trimming, Drilling
- November 16th, 2006: Made Nosegear Slit in Lower Cowl
- November 19th, 2006: Trimmed Top Cowl
- November 20th, 2006: Drilled Top Cowl to Mounting Strips
- November 22nd, 2006: Trimmed Lower Cowl
- November 26th, 2006: Started Drilling Cowl Hinges
- November 28th, 2006: Finished Drilling Cowl Hinges
- November 29th, 2006: Cowl Edge Sanding
- November 30th, 2006: Oil Fillter Door
- December 3rd, 2006: More Cowl Stuff
- December 5th, 2006: More Cowl Build-ups; Engine Controls
- December 6th, 2006: More Cowl Build-ups
- December 12th, 2006: Riveted/Epoxied Cowl Hinges
- December 16th, 2006: Installed Camlock Receptacles in top strip
- December 19th, 2006: Installed All Camlocks
- December 20th, 2006: Extended Lower Cowl; Finished Oil Door
- December 24th, 2006: More Baffle Fitting
- December 26th, 2006: Lower Cowl Support Bracket
- December 27th, 2006: Lower Cowl Support Bracket Installed; Lower Hinges Done
- December 28th, 2006: Working on flitered air box
- December 29th, 2006: Dynon EMS re-installed; FAB swiss cheese; GPS antenna
- January 20th, 2007: Prop Governor Arm Rotation (Part 1); OAT Probe; Pell City Lunch
- January 21st, 2007: OAT Probe Installed; Governor Final Installed
- January 23rd, 2007: Installed Elevator Bellcrank; More Electrical Fuel Pump Stuff
- January 24th, 2007: Fuel Pump Assembly Done; Installed Silicone Gaskets, New Alternator, Tach Transducer
- February 13th, 2007: Bafflling, Remounting Wingtips
- February 14th, 2007: More Wingtip Reinforcing; Baffles
- February 18th, 2007: Baffles
- February 20th, 2007: Yep...more baffling baffles
- February 21st, 2007: Baffle Forward Bulkheads
- February 22nd, 2007: Started Trimming Baffles to Top Cowl
- February 23rd, 2007: Finished Trimming Baffles to Top Cowl
- February 24th, 2007: Inlets; Baffle Trim and Reinforcement Angles
- February 25th, 2007: More Baffle Work
- February 27th, 2007: Started Riveting Baffles
- February 28th, 2007: More Baffle Riveting
- March 1st, 2007: Forward Right Baffles Riveted
- March 2nd, 2007: Finished Riveting Front Left Baffles
- March 3rd, 2007: Oil Cooler Stuff
- March 4th, 2007: Oil Cooler Hoses
- March 6th, 2007: Checking Cowl Clearance
- March 7th, 2007: FWF Hoses
- March 8th, 2007: Wired Alternator to Master; Fuel Pump
- March 10th, 2007: Replaced Alternator Belt
- March 11th, 2007: Wired Mags, Starter Solenoid
- March 15th, 2007: Bottom Ignition Wires; OAT, Fuel Level Wires
- April 6th, 2007: New Engine Control Bracket; Baffle Seal Material
- April 8th, 2007: More Baffle Seal Material
- April 9th, 2007: More Baffle Seal Work
- April 11th, 2007: Baffle Seals Done
- May 7th, 2007: Misc. Updates
- June 4th, 2007: Fuel Line Runs
- June 6th, 2007: More FAB Work
- June 15th, 2007: FWF Electrical Stuff
- June 16th, 2007: More FWF
- June 17th, 2007: Ignition Penetrations; Misc FWF
- June 19th, 2007: FAB Almost Done (finally)!
- June 23rd, 2007: FWF Stuff
- June 24th, 2007: Misc Safetying, etc.
- June 25th, 2007: Ready For Engine Run
- June 26th, 2007: FIRST ENGINE START!!
- July 1st, 2007: FWF Mostly Done
- May 10th, 2004: Visited Mike Stewart's 'Super 8' Project
- August 14th, 2004: RV Fix; Hangar Building
- September 12th, 2004: Flying Spam Cans To Keep Current
- September 26th, 2004: To West Virginia by RV
- October 8th, 2004: Started Taildragger Endorsement Training
- November 7th, 2004: Honey-do's; Riveted First Tank Rib
- November 26th, 2004: Flew To Cedartown; Installed Right Fuel Tank Baffle
- December 3rd, 2004: RV Christmas
- December 6th, 2004: Christmas Card 2004
- January 29th, 2005: Gas Heater; Aileron Brackets; Riveted Left Aileron Gap Seal & Flap Brace
- February 26th, 2005: Flew w/ Jaime and Amanda; Finished Right Aileron
- April 15th, 2005: Sun-n-Fun 2005 Day #1
- April 16th, 2005: Sun-n-Fun 2005 Day #2
- April 17th, 2005: Returned from SnF; Primed/Started Riveting Firewall
- May 1st, 2005: LZU to JZP; Finished Drilling Bulkheads
- May 16th, 2005: Project Diversion: Carpet
- June 23rd, 2005: Disney Day #1
- June 24th, 2005: Disney Day #2
- June 25th, 2005: Disney Day #3
- August 20th, 2005: LZU to CTJ in a Cessna
- October 16th, 2005: Went Flying; Still Playing w/ ELT
- October 22nd, 2005: My First Ride in the Super-8
- January 15th, 2006: Flew w/ Josh; Painting Disaster (possibly overstated)
- February 19th, 2006: USS Alabama
- April 6th, 2006: Sun-n-Fun 2006 Day 1
- April 7th, 2006: Sun-n-Fun 2006 Day 2
- April 8th, 2006: Sun-n-Fun 2006 Day 3
- May 6th, 2006: More Panel Cutting; Canopy Fairing; DA-20 Checkout
- June 4th, 2006: Helped Scott w/ His Wings; Installed Engine Mount
- July 2nd, 2006: Day In Atlanta (not project related)
- July 22nd, 2006: Chicago
- July 24th, 2006: Oshkosh 2006 Day 1
- July 25th, 2006: Oshkosh 2006 Day 2
- July 26th, 2006: Oshkosh 2006 Day 3
- July 27th, 2006: Oshkosh 2006 Day 4
- August 26th, 2006: Went Flying; Control Cable Routing
- September 30th, 2006: B-17 Diversion
- November 25th, 2006: Cleaned the Garage
- December 2nd, 2006: Christmas Card 2006
- January 13th, 2007: Steve Ashby's -8A; Cleaned Garge; Trim Wiring
- January 20th, 2007: Prop Governor Arm Rotation (Part 1); OAT Probe; Pell City Lunch
- February 10th, 2007: Project Visit; Wintip Work
- March 25th, 2007: Flew w/ Scott
- April 16th, 2007: My next big project
- May 1st, 2007: Downwind w/ Mike
- May 2nd, 2007: Wing Bolt Nuts are Installed
- June 1st, 2007: Back from Alaska
- July 7th, 2007: Transition Training
- July 24th, 2007: Finished Transition Training
- July 28th, 2007: AIRBORNE!
- August 3rd, 2007: Flying w/ Scott
- August 15th, 2007: More Flying; E-buss Voltage Squawk
- August 19th, 2007: 15 Hour Report
- August 26th, 2007: Interior Installed
- September 23rd, 2007: Phase I Done!
- October 27th, 2007: Busy day of flying
- October 28th, 2007: Dry Lake Allatoona
- January 3rd, 2008: 80 Hour Report
- January 18th, 2008: Proposed Paint Scheme
- January 29th, 2008: Paint Scheme III
- February 11th, 2008: Plane is in the Paint Shop
- February 23rd, 2008: Paint Shop Visit
- March 1st, 2008: E-mail Update From Bobby
- March 6th, 2008: Plane Home From Paint Shop
- March 23rd, 2008: Roanoke, VA
- April 26th, 2008: Winder for Lunch
- May 26th, 2008: Jekyll Island
- July 6th, 2008: Started First Condition Inspection
- July 18th, 2008: To Pennsylvania
- July 21st, 2008: Home from Pennsylvania
- August 2nd, 2008: Home From Oshkosh
- August 7th, 2008: Cracked Canopy, Proposed Fix
- September 27th, 2008: MT Prop Testing
- November 4th, 2008: Dynon Autopilot Install Complete
- November 29th, 2008: Lunch flight to Augusta
- April 4th, 2009: North Carolina Trip; Trutrak AP
- June 22nd, 2009: Outer Banks Trip
- August 3rd, 2010: Starting the Instrument Rating
- August 9th, 2010: First Instrument Lesson
|